The billing module calculates what a connection’s energy costs, from its meter data and its contract, with energy-cost. Both are sent with each request, so the module itself has nothing to configure.

Install: pip install "cofy-api[billing]"

Only the settings every module has:

type: billing

POST /billing/{name}/v2, with a body like this:

{
"start": "2025-01-01T00:00:00+01:00",
"end": "2025-02-01T00:00:00+01:00",
"resolution": "P1M",
"consumption": {
"type": "single_rate",
"measurements": {
"resolution": "PT15M",
"values": [
{ "timestamp": "2025-01-01T00:00:00+01:00", "value": 0.25 },
{ "timestamp": "2025-01-01T00:15:00+01:00", "value": 0.31 }
]
}
},
"contract": {
"region": "be_flanders",
"connection_type": "electricity",
"customer_type": "residential",
"distributor_key": "fluvius_imewo",
"supplier": [{ "start": "2025-01-01T00:00:00+01:00", "consumption": { "constant_cost": 90.0 } }]
}
}
Field What it is
start, end The period to bill. That of the measurements if left out.
resolution The period of each row of the bill: P1M if left out, or P1D, P1Y.
consumption The consumption meter. Required.
injection The injection meter, if any, in the same shape
contract A contract, or a list of them for a contract that changes, written as JSON

A meter has:

Field What it is
type single_rate, the default, or night_only
measurements The values, each a timestamp and the energy in kWh in the interval starting then, and their resolution
capacity Optional: the peaks, in W, in the same shape, if you have them

The billing module takes kWh and W, while energy-cost itself works in MWh and MW: the module converts them. Prices in the contract stay in €/MWh.

Measurements must cover the whole period: a period with a missing value gets no total.

For January 2025, with 0.25 kWh every quarter-hour:

{
"metadata": { "start": "2025-01-01T00:00:00+01:00", "end": "2025-02-01T00:00:00+01:00", "resolution": "P1M" },
"data": [
{
"timestamp": "2025-01-01T00:00:00+01:00",
"supplier": {
"consumption": { "total": 66.96 },
"total": { "total": 66.96 }
},
"distributor": {
"capacity": { "total": 11.304858817123286 },
"consumption": {
"levies": 1.3409856,
"public_service_fee": 24.1724856,
"transmission": 18.3104352,
"total": 43.8239064
},
"fixed": { "data_management": 1.487150684931507, "total": 1.487150684931507 },
"total": { "total": 56.615915902054795 }
},
"fees": {
"consumption": { "energy_contribution": 1.4330184, "excise": 35.32512, "total": 36.7581384 },
"total": { "total": 36.7581384 }
},
"taxes": { "total": { "total": 9.620043258123287 } },
"total": { "total": { "total": 169.95409756017807 } }
}
]
}

Each part of the bill is broken down by cost group and cost type, in €, with a total at each level. Amounts aren’t rounded, and each row’s timestamp is the start of its period, in the contract’s time zone. A part that doesn’t apply is left out. An invalid contract or meter gives a 400 with the reason.

The members module serves each member’s contract history in this same contract form, so an app can fetch a contract there and send it here.